Saturday, 21 February 2015
Production Log 4
This week me and my partner have been working hard on our shooting script going through it and checking if there were any mistakes, we eventually saw mistakes we made them and quickly corrected them leaving us with a script that we both agreed on that would work, we than filled in where we are shooting and if we needed any permission for our shots, we had our actors sign a permission slip giving us their permission to be in the film, overall this week has been a good and successful week because when we ran into problems we were able to overcome them and we got all our work done, next week we are planning to complete all of our recording ready to come and edit, during this week we also filled out a sheet of all the hazards that could possibly happen in the locations we are filming, we filled in as much as we could think of for each location and how much of a risk does it show. So really this week we are on a good schedule and not running behind, next week is half term so this will allow us to have full days to record which on our hand is great because in our scenes we need a bright day to emphasis our song better, so very good week and we already have next week planned to get the recording done so we have run into no problems that could prevent us from completing our work.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment